You are here: 首页
2010-09-09

Get the Flash Player to see this player.
Flash Image Rotator Module by Joomlashack.
Garment Industry Productivity Center
Image 2 Title
Garment Industry Productivity Center
Garment Industry Productivity Center
Garment Industry Productivity Center

训练程序
劳动力发展项目更新

Workforce Development Project Update美国国际开发署-制衣业生产力中心(GIPC)宣布公布在柬埔寨制衣业一项劳动力技能和雇主需要的评估结果。 10月,该评估的主要作者,GIPC的同事,经济学家,国际资源与发展合伙人公司(AIRD)的B. Lynn Salinger 向利益相关方介绍了评估结果,这些利益相关方包括工厂

阅读全文...
 
美国国际开发署-制衣业生产力中心(GIPC)邀请国际贸易专家

USAID-GIPC Hosts International Trade Expert美国国际开发署-制衣业生产力中心(GIPC) 邀请华盛顿特区贸易律师和纺织贸易专家Brenda Jacobs到柬埔寨来为制衣厂家、政府和工会领导更新有关竞争力 和美国的贸易议程情况。超过150名与会者于2006年9月14日相聚在五洲大酒店来获取有关对柬埔寨柬埔寨自由贸易、越南的世界贸易组织状况,和美国采 购商所从事的策略的最新洞察力。

阅读全文...
 
柬埔寨制衣业劳动力评估(2006)

该报告识别出制衣厂需求的技能,青年、学生和工人对工作/职业的期望,最后也介绍了一些柬埔寨现有提供教育和培训的大专教育和理工培训组织。评估发现,行 业需求和柬埔寨劳动力市场响应这些需求间的严重脱节。
阅读全文...
 
Upcoming Training Courses

GIPC is going to have a Pattern Making Course on 30 March 2009.  

 
纸样制造 - 制衣工业和小/中型服装制造厂商
 

为期:40小时理论和手工练习,40小时使用CAD(电脑辅助设计)系统。

要求:

  • 有使用缝纫机能力和装配基本服装能力
  • 好的数字计算能力
  • 懂讲和写英文将有帮助的,可是也将提供柬语翻译
阅读全文...
 
Pattern Making
Pattern Making – Participants will learn principles of fit analysis, garment finishes, to develop collars, skirts and sleeves as well as to create a pattern from a finished garment and a finished production pattern.
阅读全文...
 
Quality Control System
Quality Control System-Participants will learn the key components of quality control, and to provide the information needed by management to control defects and meet client requirements.
阅读全文...
 
Time Study and Textile Basics

Time Study and Textile Basics – a professional-level course to train factory engineers in time measurement, how to establish standard times, and their use.

阅读全文...
 
Time and Work Study in the Garment Industry

Work Study in the Garment Industry - a professional level course that will prepare line leaders and supervisors to analyze each step in garment assembly to improve time and quality.

阅读全文...
 
Principle of Supervision
Effective Supervision - participants will review the technical foundation of time and work study, then focus on production and cycle control and the challenges of leadership, supervision, motivation, authority.
阅读全文...
 
<< 第一页 < 上一页 1 2 3 4 下一页 > 最后一页 >>

第 21 - 30 共 33
EnglishKhmerSimplified Chinese
Our focus is on building local capacity for the future, but our programs and materials are designed to benefit the industry today.
The GIPC began in 2006 as a three year project of USAID. The implementing team is led by international development consulting firm Nathan Associates, Inc. Technical expertise in apparel production is supplied by Werner International, Inc., and the institutional development consultants of AIRD, Inc. provide project support on workforce development issues.
With our team expertise in the garment industry we can help you in:
  • Delivering your orders on time
  • Improving your production quality.
  • Cutting on your production costs.

Download Khmer Unicode

If the Khmer language text does not appear correctly or appears too small you need to (re)install Khmer Unicode on your computer. You can download the installer at below: